To build a capital facility, it is not enough to have experience, appropriate equipment, funds, personnel, etc., in most cases this will require a special document — a Building Permit.
It is not easy to obtain such a document. Only at the first stage it will be necessary to collect a lot of documents and ensure their coordination in various instances. Many owners of land plots who are planning construction or reconstruction, but do not have the relevant experience, do not even initially imagine what difficulties they will have to face when obtaining a building permit. We will try to help them by providing the necessary information.
How to get a building permit. Stage 1
The procedure for obtaining a building permit in Moscow and the Moscow Region is described in detail on the GeoGlobal/GG website http://geo-global.ru/poluchenie-razresheniya-na-stroitelstvo, let’s turn to it. Note that in other regions this order, although it differs from the above, but these differences are not of a fundamental nature.

Collecting all the documents for obtaining a building permit is very difficult.
So, in order to obtain a building permit, a special application is written, to which a package of documents is attached. This package includes:
-
Legal act of the authorized federal executive body (if its existence is provided for by law).
-
A document confirming the right to own a land plot where construction (reconstruction) is expected.
-
Town-planning plan of the land plot (GPZU) or, in the case of issuing a permit for the construction of a linear facility, details of the territory planning project (PPT) and the land surveying project (PMT).
-
Materials from project documentation:
-
explanatory note;
-
the scheme of the planning organization of the land plot, made in accordance with the GPZU, with the designation of the location of the capital construction object, entrances and passages to it, the boundaries of the areas of public easements, archaeological heritage sites, etc.;
-
scheme of the planning organization of the land plot, confirming the location of the linear object within the red lines approved as part of the territory planning documentation in relation to linear objects;
-
diagrams showing architectural solutions;
-
information about engineering equipment, a master plan of engineering networks indicating the connection points of the facility;
-
construction organization project;
-
statutory approvals of project documentation;
-
a project for the organization of work on the demolition or dismantling of existing capital construction facilities, their parts (if necessary);
-
approved technological regulations for the management of construction waste (if any).
-
-
Other documents that serve as confirmation of the need for construction work.
-
The conclusion of the state examination of project documentation (refers to the objects provided for by Article 49 of the Civil Code of the Russian Federation).
-
Permission to deviate from the limiting parameters of permitted construction, reconstruction (if such is issued to the developer in accordance with Article 40 of the Civil Code of the Russian Federation).
-
The consent of each legal owner of a capital construction object to carry out its construction or reconstruction.
But this is not all. To speed up the receipt of the Permit, it is better to provide with the above documents an expert decision based on the data of the project documentation, issued by a non-state expert council.
How to get a building permit. Stage 2
This is followed by a review of all this documentation for its completeness, as well as compliance with mandatory conditions, permits and requirements.
After 7 days, regulatory authorities are required to either issue a building permit or make a reasoned refusal. The main reasons for this refusal are as follows:
-
The land plot on which the construction is supposed to be built has other parameters than it is indicated in the project documentation.
-
The design documentation was developed with violations.
However, whatever the basis for refusal, the applicant always has the opportunity to appeal the decision in court.
As you can see, it is very difficult to collect all the documents and pass all the approvals. But it’s worth it: construction in the absence of a permit for it threatens the investor with big losses. Therefore, it is always best to contact professionals who know how to get a Building Permit quickly and without any hassle.